diff options
author | Rodrigo Moya <rodrigo@ximian.com> | 2002-05-17 00:41:35 +0800 |
---|---|---|
committer | Rodrigo Moya <rodrigo@src.gnome.org> | 2002-05-17 00:41:35 +0800 |
commit | 48140af35f90d7ec4f994821a5265b1fe0159cfa (patch) | |
tree | dd2bde3e78c4fd5db7a97dbb754b59edf66bbb4e /calendar/conduits | |
parent | aad3ac6ddd62d5cd1b3421f5bf45ccdcf1b0ed35 (diff) | |
download | gsoc2013-evolution-48140af35f90d7ec4f994821a5265b1fe0159cfa.tar.gz gsoc2013-evolution-48140af35f90d7ec4f994821a5265b1fe0159cfa.tar.zst gsoc2013-evolution-48140af35f90d7ec4f994821a5265b1fe0159cfa.zip |
added PermissionDenied exception and make it be raised in open,
2002-05-16 Rodrigo Moya <rodrigo@ximian.com>
* idl/evolution-calendar.idl: added PermissionDenied exception and
make it be raised in open, updateObjects and removeObject.
* pcs/cal-backend.h: added CAL_BACKEND_OPEN_PERMISSION_DENIED to
CalBackendOpenStatus enumeration, added CalBackendResult enumeration.
* pcs/cal.c:
* pcs/cal-backend.c:
* pcs/cal-backend-file.c: adapted to changes in update_objects and
remove_object methods.
* cal-client/cal-client.[ch]: added CalClientResult enumeration.
(cal_client_update_object, cal_client_update_objects,
cal_client_remove_object): changed to return a CalClientResult.
* conduits/calendar/calendar-conduit.c:
* calendar/conduits/todo/todo-conduit.c:
* importers/icalendar-importer.c:
* gui/dialogs/comp-editor.c:
* gui/calendar-model.c:
* gui/e-calendar-table.c:
* gui/e-day-view.c:
* gui/e-itip-control.c:
* gui/e-week-view.c:
* gui/comp-util.c:
* gui/e-tasks.c:
* gui/tasks-migrate.c: adapted to changes in cal_client_update_object(s)
and cal_client_remove_object.
svn path=/trunk/; revision=16932
Diffstat (limited to 'calendar/conduits')
-rw-r--r-- | calendar/conduits/calendar/calendar-conduit.c | 4 | ||||
-rw-r--r-- | calendar/conduits/todo/todo-conduit.c | 4 |
2 files changed, 4 insertions, 4 deletions
diff --git a/calendar/conduits/calendar/calendar-conduit.c b/calendar/conduits/calendar/calendar-conduit.c index f86e753232..6dfe288f34 100644 --- a/calendar/conduits/calendar/calendar-conduit.c +++ b/calendar/conduits/calendar/calendar-conduit.c @@ -1139,14 +1139,14 @@ static void update_comp (GnomePilotConduitSyncAbs *conduit, CalComponent *comp, ECalConduitContext *ctxt) { - gboolean success; + CalClientResult success; g_return_if_fail (conduit != NULL); g_return_if_fail (comp != NULL); success = cal_client_update_object (ctxt->client, comp); - if (!success) + if (success != CAL_CLIENT_RESULT_SUCCESS) WARN (_("Error while communicating with calendar server")); } diff --git a/calendar/conduits/todo/todo-conduit.c b/calendar/conduits/todo/todo-conduit.c index a460bd6ebc..42c8b3c865 100644 --- a/calendar/conduits/todo/todo-conduit.c +++ b/calendar/conduits/todo/todo-conduit.c @@ -824,14 +824,14 @@ static void update_comp (GnomePilotConduitSyncAbs *conduit, CalComponent *comp, EToDoConduitContext *ctxt) { - gboolean success; + CalClientResult success; g_return_if_fail (conduit != NULL); g_return_if_fail (comp != NULL); success = cal_client_update_object (ctxt->client, comp); - if (!success) + if (success != CAL_CLIENT_RESULT_SUCCESS) WARN (_("Error while communicating with calendar server")); } |