diff options
author | Damon Chaplin <damon@ximian.com> | 2001-08-22 03:06:17 +0800 |
---|---|---|
committer | Damon Chaplin <damon@src.gnome.org> | 2001-08-22 03:06:17 +0800 |
commit | c8905eabfcb6120fbf7f4ba67043d1780396dc01 (patch) | |
tree | 2642e85770860b956abd09c6728e1e11cc9517cb /calendar/gui/calendar-config.c | |
parent | a70082de9ea4f4558d6494efc5e130250ed99448 (diff) | |
download | gsoc2013-evolution-c8905eabfcb6120fbf7f4ba67043d1780396dc01.tar.gz gsoc2013-evolution-c8905eabfcb6120fbf7f4ba67043d1780396dc01.tar.zst gsoc2013-evolution-c8905eabfcb6120fbf7f4ba67043d1780396dc01.zip |
added new e-sexp operator. We don't currently use it though.
2001-08-21 Damon Chaplin <damon@ximian.com>
* pcs/query.c (func_is_completed): added new e-sexp operator. We
don't currently use it though.
* gui/dialogs/cal-prefs-dialog.glade: Changed '_Overdue' to 'O_verdue'
since we have an '_Other' notebook tab. Added '_Hide' accel.
* gui/dialogs/cal-prefs-dialog.c: hooked up config options to dialog.
* gui/calendar-config.c: added config options for hiding completed
tasks.
* gui/e-week-view-event-item.c (e_week_view_event_item_draw):
* gui/e-day-view-top-item.c (e_day_view_top_item_draw_long_event):
* gui/e-day-view.c (e_day_view_reshape_long_event): added 2 pixels
extra space between icons and text for long events, and 1 pixel space
between icons in all events.
(e_day_view_realize): changed the background color to match the
EGrayBar in the shell.
svn path=/trunk/; revision=12347
Diffstat (limited to 'calendar/gui/calendar-config.c')
-rw-r--r-- | calendar/gui/calendar-config.c | 82 |
1 files changed, 81 insertions, 1 deletions
diff --git a/calendar/gui/calendar-config.c b/calendar/gui/calendar-config.c index fd95a573b0..33be9f2f02 100644 --- a/calendar/gui/calendar-config.c +++ b/calendar/gui/calendar-config.c @@ -62,6 +62,9 @@ typedef struct gboolean show_event_end; char *tasks_due_today_color; char *tasks_overdue_color; + gboolean hide_completed_tasks; + CalUnits hide_completed_tasks_units; + gint hide_completed_tasks_value; } CalendarConfig; @@ -102,6 +105,7 @@ config_read (void) { Bonobo_ConfigDatabase db; CORBA_Environment ev; + char *units; CORBA_exception_init (&ev); @@ -179,6 +183,23 @@ config_read (void) config->tasks_overdue_color = bonobo_config_get_string_with_default ( db, "/Calendar/Tasks/Colors/TasksOverdue", "red", NULL); + config->hide_completed_tasks = bonobo_config_get_boolean_with_default ( + db, "/Calendar/Tasks/HideCompletedTasks", FALSE, NULL); + + units = bonobo_config_get_string_with_default (db, + "/Calendar/Tasks/HideCompletedTasksUnits", "days", NULL); + + if (!strcmp (units, "minutes")) + config->hide_completed_tasks_units = CAL_MINUTES; + else if (!strcmp (units, "hours")) + config->hide_completed_tasks_units = CAL_HOURS; + else + config->hide_completed_tasks_units = CAL_DAYS; + + config->hide_completed_tasks_value = bonobo_config_get_long_with_default ( + db, "/Calendar/Tasks/HideCompletedTasksValue", 1, NULL); + + bonobo_object_release_unref (db, NULL); } @@ -188,7 +209,7 @@ calendar_config_write (void) { Bonobo_ConfigDatabase db; CORBA_Environment ev; - + char *units; CORBA_exception_init (&ev); @@ -232,6 +253,22 @@ calendar_config_write (void) bonobo_config_set_string (db, "/Calendar/Tasks/Colors/TasksOverdue", config->tasks_overdue_color, NULL); + bonobo_config_set_boolean (db, "/Calendar/Tasks/HideCompletedTasks", + config->hide_completed_tasks, NULL); + + if (config->hide_completed_tasks_units == CAL_MINUTES) + units = "minutes"; + else if (config->hide_completed_tasks_units == CAL_HOURS) + units = "hours"; + else + units = "days"; + bonobo_config_set_string (db, + "/Calendar/Tasks/HideCompletedTasksUnits", + units, NULL); + bonobo_config_set_long (db, + "/Calendar/Tasks/HideCompletedTasksValue", + config->hide_completed_tasks_value, NULL); + Bonobo_ConfigDatabase_sync (db, &ev); bonobo_object_release_unref (db, NULL); @@ -538,6 +575,49 @@ calendar_config_set_working_days (CalWeekdays days) } +/* Settings to hide completed tasks. */ +gboolean +calendar_config_get_hide_completed_tasks (void) +{ + return config->hide_completed_tasks; +} + + +void +calendar_config_set_hide_completed_tasks (gboolean hide) +{ + config->hide_completed_tasks = hide; +} + + +CalUnits +calendar_config_get_hide_completed_tasks_units (void) +{ + return config->hide_completed_tasks_units; +} + + +void +calendar_config_set_hide_completed_tasks_units (CalUnits units) +{ + config->hide_completed_tasks_units = units; +} + + +gint +calendar_config_get_hide_completed_tasks_value (void) +{ + return config->hide_completed_tasks_value; +} + + +void +calendar_config_set_hide_completed_tasks_value (gint value) +{ + config->hide_completed_tasks_value = value; +} + + /* This sets all the common config settings for an ECalendar widget. These are the week start day, and whether we show week numbers. */ void |