aboutsummaryrefslogtreecommitdiffstats
path: root/calendar/gui/e-day-view.h
diff options
context:
space:
mode:
Diffstat (limited to 'calendar/gui/e-day-view.h')
-rw-r--r--calendar/gui/e-day-view.h9
1 files changed, 2 insertions, 7 deletions
diff --git a/calendar/gui/e-day-view.h b/calendar/gui/e-day-view.h
index fda44c1289..09dc3e6f41 100644
--- a/calendar/gui/e-day-view.h
+++ b/calendar/gui/e-day-view.h
@@ -52,11 +52,11 @@ extern "C" {
/* The width of the gap between appointments. This should be at least
E_DAY_VIEW_BAR_WIDTH, since in the top canvas we use this space to draw
the triangle to represent continuing events. */
-#define E_DAY_VIEW_GAP_WIDTH 8
+#define E_DAY_VIEW_GAP_WIDTH 7
/* The width of the bars down the left of each column and appointment.
This includes the borders on each side of it. */
-#define E_DAY_VIEW_BAR_WIDTH 8
+#define E_DAY_VIEW_BAR_WIDTH 7
/* The height of the horizontal bar above & beneath the selected event.
This includes the borders on the top and bottom. */
@@ -349,11 +349,6 @@ struct _EDayView
gint editing_event_day;
gint editing_event_num;
- /* This is TRUE if we are editing an event which we have just created.
- We ignore the "update_event" callback which we will get from the
- server when the event is added. */
- gboolean editing_new_event;
-
/* This is a GnomeCanvasRect which is placed around an item while it
is being resized, so we can raise it above all other EText items. */
GnomeCanvasItem *resize_long_event_rect_item;