diff options
Diffstat (limited to 'calendar/gui/e-week-view-layout.c')
-rw-r--r-- | calendar/gui/e-week-view-layout.c | 142 |
1 files changed, 71 insertions, 71 deletions
diff --git a/calendar/gui/e-week-view-layout.c b/calendar/gui/e-week-view-layout.c index 0b776adcfa..b2fc7ca158 100644 --- a/calendar/gui/e-week-view-layout.c +++ b/calendar/gui/e-week-view-layout.c @@ -47,15 +47,15 @@ static gint e_week_view_find_span_end (gboolean multi_week_view, gint display_start_day, gint day); -GArray* -e_week_view_layout_events (GArray *events, - GArray *old_spans, - gboolean multi_week_view, - gint weeks_shown, - gboolean compress_weekend, - gint start_weekday, - time_t *day_starts, - gint *rows_per_day) +GArray * +e_week_view_layout_events (GArray *events, + GArray *old_spans, + gboolean multi_week_view, + gint weeks_shown, + gboolean compress_weekend, + gint start_weekday, + time_t *day_starts, + gint *rows_per_day) { EWeekViewEvent *event; EWeekViewEventSpan *span; @@ -64,9 +64,9 @@ e_week_view_layout_events (GArray *events, GArray *spans; /* This is a temporary 2-d grid which is used to place events. - Each element is 0 if the position is empty, or 1 if occupied. - We allocate the maximum size possible here, assuming that each - event will need its own row. */ + * Each element is 0 if the position is empty, or 1 if occupied. + * We allocate the maximum size possible here, assuming that each + * event will need its own row. */ grid = g_new0 (guint8, E_WEEK_VIEW_MAX_ROWS_PER_CELL * 7 * E_WEEK_VIEW_MAX_WEEKS); @@ -80,7 +80,7 @@ e_week_view_layout_events (GArray *events, } /* Iterate over the events, finding which weeks they cover, and putting - them in the first free row available. */ + * them in the first free row available. */ for (event_num = 0; event_num < events->len; event_num++) { event = &g_array_index (events, EWeekViewEvent, event_num); e_week_view_layout_event (event, grid, spans, old_spans, @@ -110,16 +110,16 @@ e_week_view_layout_events (GArray *events, } static void -e_week_view_layout_event (EWeekViewEvent *event, - guint8 *grid, - GArray *spans, - GArray *old_spans, - gboolean multi_week_view, - gint weeks_shown, - gboolean compress_weekend, - gint start_weekday, - time_t *day_starts, - gint *rows_per_day) +e_week_view_layout_event (EWeekViewEvent *event, + guint8 *grid, + GArray *spans, + GArray *old_spans, + gboolean multi_week_view, + gint weeks_shown, + gboolean compress_weekend, + gint start_weekday, + time_t *day_starts, + gint *rows_per_day) { gint start_day, end_day, span_start_day, span_end_day, rows_per_cell; gint free_row, row, day, span_num, spans_index, num_spans, days_shown; @@ -139,7 +139,7 @@ e_week_view_layout_event (EWeekViewEvent *event, #endif /* Iterate through each of the spans of the event, where each span - is a sequence of 1 or more days displayed next to each other. */ + * is a sequence of 1 or more days displayed next to each other. */ span_start_day = start_day; rows_per_cell = E_WEEK_VIEW_MAX_ROWS_PER_CELL; span_num = 0; @@ -156,7 +156,7 @@ e_week_view_layout_event (EWeekViewEvent *event, span_end_day); #endif /* Try each row until we find a free one or we fall off the - bottom of the available rows. */ + * bottom of the available rows. */ row = 0; free_row = -1; while (free_row == -1 && row < rows_per_cell) { @@ -184,7 +184,7 @@ e_week_view_layout_event (EWeekViewEvent *event, span_start_day, span_end_day, free_row); #endif /* Add the span to the array, and try to reuse any - canvas items from the old spans. */ + * canvas items from the old spans. */ span.start_day = span_start_day; span.num_days = span_end_day - span_start_day + 1; span.row = free_row; @@ -214,14 +214,14 @@ e_week_view_layout_event (EWeekViewEvent *event, } /* Finds the day containing the given time. - If include_midnight_in_prev_day is TRUE then if the time exactly - matches the start of a day the previous day is returned. This is useful - when calculating the end day of an event. */ + * If include_midnight_in_prev_day is TRUE then if the time exactly + * matches the start of a day the previous day is returned. This is useful + * when calculating the end day of an event. */ static gint -e_week_view_find_day (time_t time_to_find, - gboolean include_midnight_in_prev_day, - gint days_shown, - time_t *day_starts) +e_week_view_find_day (time_t time_to_find, + gboolean include_midnight_in_prev_day, + gint days_shown, + time_t *day_starts) { gint day; @@ -243,16 +243,16 @@ e_week_view_find_day (time_t time_to_find, } /* This returns the last possible day in the same span as the given day. - A span is all the days which are displayed next to each other from left to - right. In the week view all spans are only 1 day, since Tuesday is below - Monday rather than beside it etc. In the month view, if the weekends are not - compressed then each week is a span, otherwise we have to break a span up - on Saturday, use a separate span for Sunday, and start again on Monday. */ + * A span is all the days which are displayed next to each other from left to + * right. In the week view all spans are only 1 day, since Tuesday is below + * Monday rather than beside it etc. In the month view, if the weekends are not + * compressed then each week is a span, otherwise we have to break a span up + * on Saturday, use a separate span for Sunday, and start again on Monday. */ static gint -e_week_view_find_span_end (gboolean multi_week_view, - gboolean compress_weekend, - gint display_start_day, - gint day) +e_week_view_find_span_end (gboolean multi_week_view, + gboolean compress_weekend, + gint display_start_day, + gint day) { gint week, col, sat_col, end_col; @@ -264,7 +264,7 @@ e_week_view_find_span_end (gboolean multi_week_view, end_col = 6; /* If the weekend is compressed we must end any spans on - Saturday and Sunday. */ + * Saturday and Sunday. */ if (compress_weekend) { sat_col = (5 + 7 - display_start_day) % 7; if (col <= sat_col) @@ -280,14 +280,14 @@ e_week_view_find_span_end (gboolean multi_week_view, } void -e_week_view_layout_get_day_position (gint day, - gboolean multi_week_view, - gint weeks_shown, - gint display_start_day, - gboolean compress_weekend, - gint *day_x, - gint *day_y, - gint *rows) +e_week_view_layout_get_day_position (gint day, + gboolean multi_week_view, + gint weeks_shown, + gint display_start_day, + gboolean compress_weekend, + gint *day_x, + gint *day_y, + gint *rows) { gint week, day_of_week, col, weekend_col; @@ -302,8 +302,8 @@ e_week_view_layout_get_day_position (gint day, day_of_week = (display_start_day + day) % 7; if (compress_weekend && day_of_week >= 5) { /* In the compressed view Saturday is above Sunday and - both have just one row as opposed to 2 for all the - other days. */ + * both have just one row as opposed to 2 for all the + * other days. */ if (day_of_week == 5) { *day_y = week * 2; *rows = 1; @@ -316,10 +316,10 @@ e_week_view_layout_get_day_position (gint day, *day_x = col; } else { /* If the weekend is compressed and the day is after - the weekend we have to move back a column. */ + * the weekend we have to move back a column. */ if (compress_weekend) { /* Calculate where the weekend column is. - Note that 5 is Saturday. */ + * Note that 5 is Saturday. */ weekend_col = (5 + 7 - display_start_day) % 7; if (col > weekend_col) col--; @@ -412,20 +412,20 @@ e_week_view_layout_get_day_position (gint day, } /* Returns TRUE if the event span is visible or FALSE if it isn't. - It also returns the number of days of the span that are visible. - Usually this can easily be determined by the start & end days and row of - the span, which are set in e_week_view_layout_event (). Though we need a - special case for the weekends when they are compressed, since the span may - not fit. */ + * It also returns the number of days of the span that are visible. + * Usually this can easily be determined by the start & end days and row of + * the span, which are set in e_week_view_layout_event (). Though we need a + * special case for the weekends when they are compressed, since the span may + * not fit. */ gboolean -e_week_view_layout_get_span_position (EWeekViewEvent *event, - EWeekViewEventSpan *span, - gint rows_per_cell, - gint rows_per_compressed_cell, - gint display_start_day, - gboolean multi_week_view, - gboolean compress_weekend, - gint *span_num_days) +e_week_view_layout_get_span_position (EWeekViewEvent *event, + EWeekViewEventSpan *span, + gint rows_per_cell, + gint rows_per_compressed_cell, + gint display_start_day, + gboolean multi_week_view, + gboolean compress_weekend, + gint *span_num_days) { gint end_day_of_week; @@ -440,9 +440,9 @@ e_week_view_layout_get_span_position (EWeekViewEvent *event, if (multi_week_view) { if (compress_weekend) { /* If it ends on a Saturday and is 1 day glong - we skip it, else we shorten it. If it ends - on a Sunday it must be 1 day long and we - skip it. */ + * we skip it, else we shorten it. If it ends + * on a Sunday it must be 1 day long and we + * skip it. */ if (end_day_of_week == 5) { /* Sat */ if (*span_num_days == 1) { return FALSE; |