aboutsummaryrefslogtreecommitdiffstats
path: root/calendar/gui/alarm.c
diff options
context:
space:
mode:
authorFederico Mena Quintero <federico@helixcode.com>2000-08-30 06:36:38 +0800
committerFederico Mena Quintero <federico@src.gnome.org>2000-08-30 06:36:38 +0800
commit1b087914b96c5fafdcde98d29079dce539a53cf1 (patch)
treebb5bfebe79c34d5a2c46fa84c340d607d4c78852 /calendar/gui/alarm.c
parent8b546f3dfa39bceb5d28c2b9b09f3445b46b6b6d (diff)
downloadgsoc2013-evolution-1b087914b96c5fafdcde98d29079dce539a53cf1.tar.gz
gsoc2013-evolution-1b087914b96c5fafdcde98d29079dce539a53cf1.tar.zst
gsoc2013-evolution-1b087914b96c5fafdcde98d29079dce539a53cf1.zip
Now the views monitor the client by themselves; it does not make sense to
2000-08-29 Federico Mena Quintero <federico@helixcode.com> Now the views monitor the client by themselves; it does not make sense to proxy all notifications through the GnomeCal. The GnomeCal should just be a meta-widget that holds all the views. At some later point we'll want to decouple the views from the GnomeCal so that they can be embedded anywhere; they should emit signals to request appropriate actions from the toplevel GUI instead of calling the GnomeCal directly. * gui/e-day-view.c (e_day_view_set_cal_client): New function; now the day view monitors the client by itself. (cal_loaded_cb): New callback; moved over from e_day_view_update_all_events(). (obj_updated_cb): New callback; moved over from e_day_view_update_event(). (obj_removed_cb): New callback; moved over from e_day_view_remove_event(). (e_day_view_update_all_events): Removed function. (e_day_view_update_event): Removed function. (e_day_view_remove_event): Removed function. (*): Use the day_view->client directly instead of fetching it from the GnomeCal. (e_day_view_destroy): Unref the client. (e_day_view_reload_events): Check if the client is loaded. (e_day_view_key_press): Set the vtype of the new component. * gui/e-week-view.c (e_week_view_set_cal_client): New function. (cal_loaded_cb): New callback. (obj_updated_cb): New callback. (obj_removed_cb): New callback. (e_week_view_update_all_events): Removed function. (e_week_view_update_event): Removed function. (e_week_view_remove_event): Removed function. (*): Use the week_view->client directly. (e_week_view_destroy): Unref the client. (e_week_view_reload_events): Check if the client is loaded. * gui/gnome-cal.c (setup_widgets): Set the cal_client on all the views. (gnome_calendar_update_all): Do not update the views, since now they do it themselves. (gnome_calendar_object_updated_cb): Likewise. (gnome_calendar_object_removed_cb): Likewise. (setup_widgets): Remove all to-do list cruft. (gnome_calendar_colors_changed): Likewise. (gnome_calendar_todo_properties_changed): Likewise. * gui/calendar-commands.h (todo_style_changed): Removed variable. * gui/gncal-todo.c: Removed old clist cruft; just left in the temporary dialog box for now. svn path=/trunk/; revision=5105
Diffstat (limited to 'calendar/gui/alarm.c')
-rw-r--r--calendar/gui/alarm.c4
1 files changed, 2 insertions, 2 deletions
diff --git a/calendar/gui/alarm.c b/calendar/gui/alarm.c
index c89b65ff5e..085111498b 100644
--- a/calendar/gui/alarm.c
+++ b/calendar/gui/alarm.c
@@ -139,7 +139,7 @@ alarm_ready (gpointer data, gint fd, GdkInputCondition cond)
g_assert (alarms != NULL);
ar = pop_alarm ();
- g_message ("alarm_ready(): Notifying about alarm on %s", ctime (&ar->trigger));
+ g_print ("alarm_ready(): Notifying about alarm on %s\n", ctime (&ar->trigger));
(* ar->alarm_fn) (ar, ar->trigger, ar->data);
@@ -226,7 +226,7 @@ alarm_add (time_t trigger, AlarmFunction alarm_fn, gpointer data,
ar->data = data;
ar->destroy_notify_fn = destroy_notify_fn;
- g_message ("alarm_add(): Adding alarm for %s", ctime (&trigger));
+ g_print ("alarm_add(): Adding alarm for %s\n", ctime (&trigger));
if (!queue_alarm (now, ar)) {
if (ar->destroy_notify_fn)