diff options
author | Federico Mena Quintero <federico@helixcode.com> | 2000-08-30 06:36:38 +0800 |
---|---|---|
committer | Federico Mena Quintero <federico@src.gnome.org> | 2000-08-30 06:36:38 +0800 |
commit | 1b087914b96c5fafdcde98d29079dce539a53cf1 (patch) | |
tree | bb5bfebe79c34d5a2c46fa84c340d607d4c78852 /calendar/gui/e-day-view.h | |
parent | 8b546f3dfa39bceb5d28c2b9b09f3445b46b6b6d (diff) | |
download | gsoc2013-evolution-1b087914b96c5fafdcde98d29079dce539a53cf1.tar.gz gsoc2013-evolution-1b087914b96c5fafdcde98d29079dce539a53cf1.tar.zst gsoc2013-evolution-1b087914b96c5fafdcde98d29079dce539a53cf1.zip |
Now the views monitor the client by themselves; it does not make sense to
2000-08-29 Federico Mena Quintero <federico@helixcode.com>
Now the views monitor the client by themselves; it does not make
sense to proxy all notifications through the GnomeCal. The
GnomeCal should just be a meta-widget that holds all the views.
At some later point we'll want to decouple the views from the
GnomeCal so that they can be embedded anywhere; they should emit
signals to request appropriate actions from the toplevel GUI
instead of calling the GnomeCal directly.
* gui/e-day-view.c (e_day_view_set_cal_client): New function; now
the day view monitors the client by itself.
(cal_loaded_cb): New callback; moved over from
e_day_view_update_all_events().
(obj_updated_cb): New callback; moved over from
e_day_view_update_event().
(obj_removed_cb): New callback; moved over from
e_day_view_remove_event().
(e_day_view_update_all_events): Removed function.
(e_day_view_update_event): Removed function.
(e_day_view_remove_event): Removed function.
(*): Use the day_view->client directly instead of fetching it from
the GnomeCal.
(e_day_view_destroy): Unref the client.
(e_day_view_reload_events): Check if the client is loaded.
(e_day_view_key_press): Set the vtype of the new component.
* gui/e-week-view.c (e_week_view_set_cal_client): New function.
(cal_loaded_cb): New callback.
(obj_updated_cb): New callback.
(obj_removed_cb): New callback.
(e_week_view_update_all_events): Removed function.
(e_week_view_update_event): Removed function.
(e_week_view_remove_event): Removed function.
(*): Use the week_view->client directly.
(e_week_view_destroy): Unref the client.
(e_week_view_reload_events): Check if the client is loaded.
* gui/gnome-cal.c (setup_widgets): Set the cal_client on all the
views.
(gnome_calendar_update_all): Do not update the views, since now
they do it themselves.
(gnome_calendar_object_updated_cb): Likewise.
(gnome_calendar_object_removed_cb): Likewise.
(setup_widgets): Remove all to-do list cruft.
(gnome_calendar_colors_changed): Likewise.
(gnome_calendar_todo_properties_changed): Likewise.
* gui/calendar-commands.h (todo_style_changed): Removed variable.
* gui/gncal-todo.c: Removed old clist cruft; just left in the
temporary dialog box for now.
svn path=/trunk/; revision=5105
Diffstat (limited to 'calendar/gui/e-day-view.h')
-rw-r--r-- | calendar/gui/e-day-view.h | 18 |
1 files changed, 6 insertions, 12 deletions
diff --git a/calendar/gui/e-day-view.h b/calendar/gui/e-day-view.h index 955ef0541c..379699accd 100644 --- a/calendar/gui/e-day-view.h +++ b/calendar/gui/e-day-view.h @@ -188,6 +188,9 @@ struct _EDayView /* The calendar we are associated with. */ GnomeCalendar *calendar; + /* Calendar client object we are monitoring */ + CalClient *client; + /* The start and end of the day shown. */ time_t lower; time_t upper; @@ -414,6 +417,9 @@ GtkWidget* e_day_view_new (void); void e_day_view_set_calendar (EDayView *day_view, GnomeCalendar *calendar); +void e_day_view_set_cal_client (EDayView *day_view, + CalClient *client); + /* This sets the selected time range. The EDayView will show the day or week corresponding to the start time. If the start_time & end_time are not equal and are both visible in the view, then the selection is set to those times, @@ -427,18 +433,6 @@ void e_day_view_get_selected_time_range (EDayView *day_view, time_t *start_time, time_t *end_time); -/* This reloads all calendar events. */ -void e_day_view_update_all_events (EDayView *day_view); - -/* This is called when one event has been added or updated. */ -void e_day_view_update_event (EDayView *day_view, - const gchar *uid); - -/* This removes all the events associated with the given uid. Note that for - recurring events there may be more than one. If any events are found and - removed we need to layout the events again. */ -void e_day_view_remove_event (EDayView *day_view, - const gchar *uid); /* The number of days shown in the EDayView, from 1 to 7. This is normally either 1 or 5 (for the Work-Week view). */ |